Please Note: The access has been revised and is indicated on the picture titled "revised plan". There has also been the following revisions: The removal of car port and simply provide 1400mm high retaining wall on eastern boundary. The existing western boundary wall is 2.1m high and will be reduced in height to 1.2m. The only frontage access will be the vehicle access with a path behind 1.2m high boundary wall. The existing sceptic tank for Cradlebridge House to be removed and the 100mm drain to be connected to the new drainage on plot 1. The new foul and surface water drainage system to be connected to existing manholes at junction with Cobb Place.
Available plots
View Map